The project involves the construction of a building industrial, prefabricated, intended for the treatment of biodegradable organic waste from separate collection for the production of compost.
The work includes:
- Building of a FEM finite element model of the biocells and of the structure foundation for analysis in static and seismic conditions
- Design of the main structural elements according to the Italian Technical Standard (NTC2018 and Circolare 2019)
- Final report and technical drawings